Wallaceburg Water Pollution Control Plant
The
Challenge/Problem
The Wallaceburg WPCP is a conventional activated sludge plant with a rated design wastewater flow of 10,800 m3/d (2.9 MGD) providing treatment of domestic wastewater for approximately 11,000 residents of the Town of Wallaceburg.
The Wallaceburg WPCP was struggling with plant upsets relating to overloading that were causing the following issues:
SciCorp Treatment Plan and Execution
Working with SciCorp engineers, the Wallaceburg plant initiated a full scale, 90 day treatment project. SciCorp engineers reviewed the plant operating data and recommended a continual dosage of BIOLOGIC™ SR2 at the headworks of the wastewater treatment plant.
Success
At the conclusion of the 90-day program the WWTP was able to achieve the following results with the use of BIOLOGIC™ SR2:
26%
Reduction
Reduction in sludge produced and costs associated with sludge disposal
11%
Reduction
Increase in dissolved oxygen levels in aeration tanks
72%
Decrease
Decrease in ammonia in the effluent
44%
Reduction
Reduction in BOD levels in the effluent
“The product eliminated foaming throughout the plant. Addition of the product reduced our sludge handling and disposal costs when compared to previous years data”
- Plant Manager