NORTH CAROLINA WASTEWATER TREATMENT PLANT
The
Challenge/Problem
A North Carolina municipal wastewater plant with a flow of 60 MGD was struggling with excessive sludge production, plant upsets associated with variable influent loading, and rising odor complaints within the plant. Plant operators were seeking to achieve the following objectives:
Specific problems included:
SciCorp Treatment Plan and Execution
SciCorp engineers partnered with plant operators to identify a BIOLOGIC™ SR2 treatment program designed to achieve the treatment objectives identified by the WWTP.
Success
After a 60 day trial, the data collected by the wastewater treatment plant demonstrated that SciCorp achieved significant benefits for the WWTP.
Including:
Elimination of consistent plant upsets
Elimination of odors throughout the plant
20%
Reduction
Reduction in TSS concentrations in effluent
50%
Decrease
Decrease in ammonia (NH3) concentrations in effluent
34%
Reduction
Reduction of sludge produced (annual costs savings + $250,000)
Issues Avoided
As a result of this trial SciCorp demonstrated that the WWTP was able to avoid: